top of page

Salvador  Port -    (     G.Cargo, Projects ,    Wheat  , WOOD PULP   )

Pier                               Draft         dwT          LOA        dISPLACEMENT       lOAD / dISCHRATE     W.D          EQUIPMENTS

PIER 3-4                                    11,50 m         50.000          300  m       60.000                       3/40000mt p/day            1,025         Ship´s  crane  use

PIER 5-6-7-8                              8,00 m           40.000          460 m       50.000                      3/40000mt p/day             1,025         Ship´s crane use

​TECONT                                    12,00 m           65.000         200 m      84.0000                    3/40000mt p/day             1,025        Ship´s crane  use

Pier Cais  Carvão(Wheat)        8,00 m           40.000          250 m       50.0000                    3/40000mt p/day             1,025         New ShipUnloader

Important :

  •     Max draft x  Floating pontoons:  The  max draft of the Piers where draft is  8,00 m  can be increased  to 9,80 m  when   using   Floating pontoons (measures   : 4m x 4m ).The cost of use  of 02 Floating pontoons per day is   usd  266,00 per day  which  paid by Ship/Owners.                                                                                                   

Important :

  •     New ShipUnloader equipment for wheat( Portalino):  In  September 2017  Wheat Importer leaders  - Moinho J.Macedo investing in Salvador Port delivered to operation of wheat discharge a  brand new ShipUnloader equipment which is projected to  raise the discharge rate from average  2.3/2500 mt  to  6000 mt per day after all necessary adjustments concluded .                                                                                                    

bottom of page